Core Studio 4: Week 10- Project 2 Progress 4

Based on the feedback given by Lily I did the following changes to my second draft:

  • Changed all the writing to french
  • Added the music in the credits
  • Shortened the train station sequence
  • Changed the sound of the boucherie introductory title

Here’s the link to the final draft:

 

Leave a reply

Skip to toolbar