Materiality and Assembly: system for studio final update The most recent update to my system is changing from creating a facade system to a system A being the stairs… Posted on: April 11, 2019 By: mulla795 With: 0 Comments
Midterm: Design studio 2 [gallery ids="1194,1195"] [gallery ids="1196,1197,1198"] [gallery ids="1208,1207,1209,1210,1211,1212,1213"] [gallery ids="1199,1200,1201"] [gallery ids="1206,1202,1203,1204,1205"] Posted on: April 2, 2019 By: mulla795 With: 0 Comments
Materiality and Assembly Assignment 2.1 update [gallery ids="1171,1169,1170,1178,1179,1180,1181,1182,1183,1187,1188,1172,1173,1174,1191,1190,1176,1175,1177,1184,1185,1186"] Posted on: April 2, 2019 By: mulla795 With: 0 Comments
materiality and assembly: system for studio final Facade system to enclose the outdoor performance when need. System A is the wire track that the panels(system… Posted on: April 1, 2019 By: mulla795 With: 0 Comments