Year 2

Final: Design studio 2

Final: Design studio 2

Sketch models [gallery ids="1239,1240,1241,1242,1243,1244"] Process [gallery ids="1245,1246,1247,1248"] 1/20" massing model [gallery ids="1249,1250,1251,1252"] 1/8" detail model [gallery ids="1259,1254,1260,1263,1262,1255,1261,1257,1256,1253,1258"] Blurb Plans [gallery…

Midterm: Design studio 2

  [gallery ids="1194,1195"] [gallery ids="1196,1197,1198"] [gallery ids="1208,1207,1209,1210,1211,1212,1213"] [gallery ids="1199,1200,1201"] [gallery ids="1206,1202,1203,1204,1205"]

Assignment 1.3 update

[caption id="attachment_1128" align="aligncenter" width="225"] Pinned up[/caption] [caption id="attachment_1129" align="aligncenter" width="225"] pinned up[/caption] [caption id="attachment_1130" align="aligncenter" width="225"] pinned up[/caption] [caption id="attachment_1123"…

assignment 1.3 progress 3/11/2019

[caption id="attachment_1115" align="aligncenter" width="300"] first floor plan[/caption] [caption id="attachment_1122" align="aligncenter" width="300"] second-floor plan[/caption] [caption id="attachment_1123" align="aligncenter" width="297"] third-floor plan[/caption]  …

assignment 1.3 progress 3/4/2019

[caption id="attachment_1107" align="aligncenter" width="256"] third floor plan[/caption] [caption id="attachment_1108" align="aligncenter" width="300"] second-floor plan[/caption] [caption id="attachment_1109" align="aligncenter" width="300"] first-floor plan[/caption] start…
1 of 2
12
Skip to toolbar