Bridge 4 – Phase one Progress

Description:

Showcase reliable organized process for Bridge 4.

Time management: 

09 / 04/ 19 : Done with several sketches and visualization aspects

12 / 04/ 19 : Finished Material outlook

12 / 04/ 19 : Start modelling

19 / 04/ 19 : Finished structure of model

23 / 04/ 19 : Reviewed and improved model with dimension drawings.

Research overlook:

Similar open galleries, creative communities and more..

Image result for open galleries infrastructureRelated image

Related imageRelated image

Image result for design of an open outdoor art galleriesRelated image

Design development:

First model example

Reflection:

This assignment was fruitful for the time management of the project I’m pursuing for Bridge 4.

 

Leave a reply

Skip to toolbar